亚洲一区二区三区嗯嗯嗯_久久精品無碼一區二區日韓av_韩国日本福利在线_性色欲情网站IWWW_日韩欧美一卡二卡_亚洲天堂黄色网站B性爱_深夜国产福利在线观看_东北浓毛HD脏话对白熟女_99影院亚洲视频在线观看_国产成人无码免费视频软件

National Distribution Hotline
百葉窗圖片載入中
Product category
news
Contact us

圖片

 

Company: Evlight Electronics(HK) Limited

Add:  Room 1C 1605, Wankejinyudongjun, Pingshan New Town, Longgang, Shenzhen,China

Tel: 020-84647280   

Fax: 86-20-84698069

Email: everlight@163.com,david@evlight.com

Your location:Home>>Product>>LED Lamps
LED Lamps
Bi-color LED,LED Lamps
  • Product name:

    Bi-color LED,LED Lamps

  • Product classification:LED Lamps
  • Release time:2024-11-7 8:3:20
  • brand:CIC dick
  • market price:¥0.00
  • Local price:¥0.00
  • Product Brief:

Hotline:020-84647280
在線購買
product details

339-9

 Features

˙Popular T-1 3/4 round package.

˙High efficiency.

˙Built in red, yellow, and green chips.

˙Selected minimum intensities.

˙Available on tape and reel.

˙The product itself will remain within RoHS compliant version

 

 Descriptions

˙The series is specially designed for applications requiring higher brightness

˙The LED lamps are available with different colors, intensities, epoxy, colors, etc.

 

 Applications

˙Status indicators.

˙Commercial use.

˙Advertising Signs.

˙Computer

Notes

1. Lead Forming

? During lead formation, the leads should be bent at a point at least 3mm from the base of the epoxy bulb.

? Lead forming should be done before soldering.

? Avoid stressing the LED package during leads forming. The stress to the base may damage the LED’s characteristics or it may break the LEDs.

? Cut the LED leadframes  at room temperature. Cutting the leadframes at high temperatures may cause failure of the LEDs.

? When mounting the LEDs onto a PCB, the PCB holes must be aligned exactly with the lead position of the LED. If the LEDs are mounted with stress at the leads, it causes deterioration of the epoxy resin and this will degrade the LEDs.

2. Storage

? The LEDs should be stored at 30°C or less and 70%RH or less after being shipped from Everlight and the storage life limits are 3 months. If the LEDs are stored for 3 months or more, they can be stored for a year in a sealed container with a nitrogen atmosphere and moisture absorbent material.

? Please avoid rapid transitions in ambient temperature, especially, in high humidity environments where condensation can occur.

3. Soldering

? Careful attention should be paid during soldering. When soldering, leave more then 3mm from solder joint to epoxy bulb, and soldering beyond the base of the tie bar is recommended. 

Online purchase:Bi-color LED,LED Lamps
Name:
*
Tel:
*
Email:
*
The intent to purchase description:
*
Please fill inPurchaseQuantity and description of products to facilitate our unified stock preparation。
Code:
Net safety
QR code